Burke, R D, Parrish, K and El Asmar, M (2018) Environmental Product Declarations: Use in the Architectural and Engineering Design Process to Support Sustainable Construction. Journal of Construction Engineering and Management, 144(05).

Delgado, L, Shealy, T, Garvin, M and Pearce, A (2018) Framing Energy Efficiency with Payback Period: Empirical Study to Increase Energy Consideration during Facility Procurement Processes. Journal of Construction Engineering and Management, 144(05).

Doloi, H (2018) Community-Centric Model for Evaluating Social Value in Projects. Journal of Construction Engineering and Management, 144(05).

  • Type: Journal Article
  • Keywords: Social value creation; Public participation; Social network theory; Infrastructure projects;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001473
  • Abstract:
    Increasing public participation in infrastructure projects elicits the need for a rationalized approach for quantifying value creation in the societal context. Although economic and environmental viability may be relatively easy to quantify, theories for quantitative evaluation of social performance and underlying social value creation in public infrastructure projects from a community perspective remain unexplored. This paper argues that the needs and requirements of the community should be at the core in planning for infrastructure projects. The success and failure of these projects should be intrinsically linked to the social value being created for the community at large. Addressing this knowledge gap, this paper develops a community-centric framework by considering public viewpoints at the core of infrastructure planning across a range of project characteristics. Based on social network theory, four key stakeholder networks—interest, impact, communication, and satisfaction networks—are investigated and the underlying network measures are then used to compute mathematically the social performance index (SPI) of the entire project. The SPI is then compared with a threshold value so that an acceptable level of social performance can be ensured while planning the project. The application of the framework is demonstrated in a case study project. The research contributes new knowledge in evaluation of public projects across planning, business, and construction management literature.

El-Sabek, L M and McCabe, B Y (2018) Framework for Managing Integration Challenges of Last Planner System in IMPs. Journal of Construction Engineering and Management, 144(05).

Farshchian, M M and Heravi, G (2018) Probabilistic Assessment of Cost, Time, and Revenue in a Portfolio of Projects Using Stochastic Agent-Based Simulation. Journal of Construction Engineering and Management, 144(05).

Liang, Q, Leung, M and Cooper, C (2018) Focus Group Study to Explore Critical Factors for Managing Stress of Construction Workers. Journal of Construction Engineering and Management, 144(05).

Lines, B C and Ravi Kumar, G G (2018) Developing More Competitive Proposals: Relationship between Contractor Qualifications-Based Proposal Content and Owner Evaluation Scores. Journal of Construction Engineering and Management, 144(05).

Mahpour, A and Mortaheb, M M (2018) Financial-Based Incentive Plan to Reduce Construction Waste. Journal of Construction Engineering and Management, 144(05).

Nguyen, D A, Garvin, M J and Gonzalez, E E (2018) Risk Allocation in U.S. Public-Private Partnership Highway Project Contracts. Journal of Construction Engineering and Management, 144(05).

Rocha, C G d, Anzanello, M J and Gerchman, M (2018) Method to Assess the Match between Clients’ Input and Decoupling Points in Customized Building Projects. Journal of Construction Engineering and Management, 144(05).

Schuldt, S and El-Rayes, K (2018) Optimizing the Planning of Remote Construction Sites to Minimize Facility Destruction from Explosive Attacks. Journal of Construction Engineering and Management, 144(05).

Tembo-Silungwe, C K and Khatleli, N (2018) Identification of Enablers and Constraints of Risk Allocation Using Structuration Theory in the Construction Industry. Journal of Construction Engineering and Management, 144(05).

Yap, J B H, Abdul-Rahman, H and Wang, C (2018) Preventive Mitigation of Overruns with Project Communication Management and Continuous Learning: PLS-SEM Approach. Journal of Construction Engineering and Management, 144(05).

Zhang, M, Cheng, W and Wang, Y (2018) Multiple-Fault Classification for Hot-Mix Asphalt Production by Machine Learning. Journal of Construction Engineering and Management, 144(05).